William Hudson (engineer)
Sir William Hudson was a New Zealand-born engineer who headed construction of the Snowy Mountains Scheme for hydroelectricity and irrigation in Australia from 1949 to 1967, when he reluctantly retired at 71. The scheme was completed in 1974, under budget and before time.
William Hudson (engineer)
The Snowy Mountains Scheme, also known as the Snowy Hydro or the Snowy scheme, is a hydroelectricity and irrigation complex in south-east Australia. Near the border of New South Wales and Victoria, the scheme consists of sixteen major dams; nine power stations; two pumping stations; and 225 kilometres (140 mi) of tunnels, pipelines and aqueducts that were constructed between 1949 and 1974. The Scheme was completed under the supervision of Chief Engineer, Sir William Hudson. It is the largest engineering project undertaken in Australia.
Official launch of the Snowy Mountains Scheme at Adaminaby. From the left, Prime Minister, Ben Chifley; Governor-General, William McKell and Minister for Works and Housing, Nelson Lemmon, 1949.
William Hudson KBE FRS Commissioner Snowy Mountains Hydro Electric Authority 1949-1967. Plaque at Cooma Visitors Centre.
The Machine Hall Floor of Murray-1 Hydroelectric Power Station.
Talbingo Dam. 16 major dams store water in the scheme. Many were constructed in rugged wilderness areas.