Wilshire/La Brea station is an under construction, underground rapid transit station on the D Line of the Los Angeles Metro Rail system at the intersection of Wilshire Boulevard and La Brea Avenue. It is slated to open in 2025. The D Line will serve it and will be the first station on that line west of Wilshire/Western station.
The interior of the station, under construction in November 2023.
D Line (Los Angeles Metro)
The D Line is a fully underground 5.1-mile (8.2 km) rapid transit line operating in Los Angeles, running between Koreatown and Downtown Los Angeles. It is one of six lines on the Metro Rail system, operated by the Los Angeles County Metropolitan Transportation Authority.
D Line train at Union Station
Metro D Line train at Union Station. The Metro B and D lines both end at Union Station, the eastern terminus of both lines.
Opening day of the Metro extension to Wilshire (July 1996) at the Wilshire/Normandie station
Wilshire/La Brea station under construction in November 2023