Infinite photos and videos for every Wiki article · Find something interesting to watch in seconds
History
Page
7 Subway Extension
7 Subway Extension
Overview of subway construction area with arrows pointing to the entrances. (Left arrow points to main 34th Street entrance; right arrow, secondary 35
Overview of subway construction area with arrows pointing to the entrances. (Left arrow points to main 34th Street entrance; right arrow, secondary 35th Street entrance.)
Digging the station cavern
Digging the station cavern
Construction Site P, 11th Avenue and 33rd Street in May 2010
Construction Site P, 11th Avenue and 33rd Street in May 2010
Page
Top: A 1 train made up of ten R62A cars enters the 207th Street elevated station. Bottom: An E train made up of ten R160A cars enters the 42nd Street–
Top: A 1 train made up of ten R62A cars enters the 207th Street elevated station. Bottom: An E train made up of ten R160A cars enters the 42nd Street–Port Authority Bus Terminal station.
Image: Bombardier R62A “1” Train arriving into 207th Street   November 2022
Image: Bombardier R62A “1” Train arriving into 207th Street November 2022
Some old pictures from the New York City Subway (1910)
Some old pictures from the New York City Subway (1910)
The City Hall station of the IRT Lexington Avenue Line, part of the first underground line of the subway that opened on October 27, 1904
The City Hall station of the IRT Lexington Avenue Line, part of the first underground line of the subway that opened on October 27, 1904