The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
The canal near Congerstone
The canal near Congerstone
Snarestone Tunnel, just before the present terminus, is crooked in the middle
Snarestone Tunnel, just before the present terminus, is crooked in the middle
The restored section of the Ashby de la Zouch Canal alongside Moira Furnace, now a museum.
The restored section of the Ashby de la Zouch Canal alongside Moira Furnace, now a museum.
The short new section of canal at Snarestone excavated in 2010. Beyond the bend at the far end, work started on the next section in 2012.
The short new section of canal at Snarestone excavated in 2010. Beyond the bend at the far end, work started on the next section in 2012.
Ticknall Tramway
Switch of the “Outram Way”
Switch of the “Outram Way”
Blackwater Pit
Blackwater Pit
Tramway bridge at Woodlands Wharf
Tramway bridge at Woodlands Wharf