The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
E5 series set operating a Hayabusa service entering Ōmiya Station, March 2023
E5 series set operating a Hayabusa service entering Ōmiya Station, March 2023
Combined Fuji/Hayabusa service hauled by an EF66 locomotive, March 2009
Combined Fuji/Hayabusa service hauled by an EF66 locomotive, March 2009
The final Hayabusa and Fuji service after arriving at Tokyo Station, 14 March 2009
The final Hayabusa and Fuji service after arriving at Tokyo Station, 14 March 2009
JR Hokkaido H5 series set H1 on a combined Hayabusa and Komachi service in June 2022
JR Hokkaido H5 series set H1 on a combined Hayabusa and Komachi service in June 2022
A lineup of JR East Shinkansen trains in October 2012. From left to right: E5, 200, E4, E2, E3, E926 "East i", and E1.
A lineup of JR East Shinkansen trains in October 2012. From left to right: E5, 200, E4, E2, E3, E926 "East i", and E1.
A 0 series set running between Mishima and Shin-Fuji on the Tokaido Shinkansen, with Mount Fuji in the background
A 0 series set running between Mishima and Shin-Fuji on the Tokaido Shinkansen, with Mount Fuji in the background
Shinkansen standard-gauge track, with welded rails to reduce vibration
Shinkansen standard-gauge track, with welded rails to reduce vibration
Replica of the Shinkansen CTC as seen at the Kyoto Railway Museum
Replica of the Shinkansen CTC as seen at the Kyoto Railway Museum