The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
Platforms 3 of Ho Man Tin station in October 2024
Platforms 3 of Ho Man Tin station in October 2024
Panorama of a Kwun Tong line platform in October 2016
Panorama of a Kwun Tong line platform in October 2016
Exit A1
Exit A1
Exit A2
Exit A2
While heavy road traffic on the surface, train tunnel is building underneath at Causeway Bay section
While heavy road traffic on the surface, train tunnel is building underneath at Causeway Bay section
Expansion of City One platform with new platform gates, allowing 8-coach trains to stop
Expansion of City One platform with new platform gates, allowing 8-coach trains to stop
All existing SP1900 EMU trains were transferred to and now operated on the East West Corridor
All existing SP1900 EMU trains were transferred to and now operated on the East West Corridor
The R-train operates on the North South Corridor,
The R-train operates on the North South Corridor,