The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
Platform level of Jalan Besar station
Platform level of Jalan Besar station
Exit A of the station
Exit A of the station
A C951 train at Stevens station
A C951 train at Stevens station
Construction site of Rochor in August 2014, which involved the diversion of the Rochor Canal
Construction site of Rochor in August 2014, which involved the diversion of the Rochor Canal
The temporary viaduct built at Cross Street for the construction of Telok Ayer in December 2010
The temporary viaduct built at Cross Street for the construction of Telok Ayer in December 2010
The construction of DTL tunnels between Chinatown and Fort Canning. The project was considered an engineering feat, as the construction of the tunnels
The construction of DTL tunnels between Chinatown and Fort Canning. The project was considered an engineering feat, as the construction of the tunnels involved the diversion of the Singapore River.