Laredo–Colombia Solidarity International Bridge
The Laredo–Colombia Solidarity International Bridge is one of four vehicular international bridges located on the U.S.–Mexico border in the city of Laredo, Texas; it connects Laredo over the Rio Grande with Colombia, Nuevo León. It is owned and operated by the City of Laredo and the Secretaría de Comunicaciones y Transportes.
Laredo International Bridge 3
State Highway 255 (SH 255) is state highway in the U.S. state of Texas that allows international traffic to bypass Laredo. Located in Webb County, the highway provides a connection between the Laredo–Colombia Solidarity International Bridge to Interstate 35 (I-35). The route opened in 2000 as the Camino Colombia Toll Road, and was one of the few operating toll roads in the United States to have gone through the legal process of foreclosure. The toll designation was removed from the route in 2017.
I-35 Interchange
Toll rates as seen on I-35 south in 2008