The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
Train Alstom Metropolis 9000 of Line 1
Train Alstom Metropolis 9000 of Line 1
The construction of Line 1 of the Lima Metro remained paralyzed for over 20 years until it was resumed in 2010.
The construction of Line 1 of the Lima Metro remained paralyzed for over 20 years until it was resumed in 2010.
The Lima Metro at its beginnings
The Lima Metro at its beginnings
Train at the San Carlos Station
Train at the San Carlos Station
Lima Airport in 1960
Lima Airport in 1960
Lima Airport in 1972 with a SATCO Douglas DC-4 operating an internal flight
Lima Airport in 1972 with a SATCO Douglas DC-4 operating an internal flight
Check in area in the old terminal
Check in area in the old terminal
Construction of the new terminal in 2023
Construction of the new terminal in 2023