Northern and Eastern Railway
…was abandoned, and the share capital was reduced to £720,000. On 15 September 1840 the N&ER started operation between the ECR's Stratford station and Broxbourne, a distance of about 15 miles (24 km). At first this was a single track; it was doubled in 1841. Trains ran through from Shoreditch, but the ECR insisted…