STS-41-C was NASA's eleventh Space Shuttle mission, and the fifth mission of Space Shuttle Challenger. The launch, which took place on April 6, 1984, marked the first direct ascent trajectory for a Space Shuttle mission. During the mission, Challenger's crew captured and repaired the malfunctioning Solar Maximum Mission satellite, and deployed the Long Duration Exposure Facility (LDEF) experimental apparatus. STS-41-C was extended one day due to problems capturing the Solar Max satellite, and the landing on April 13, 1984, took place at Edwards Air Force Base, instead of at Kennedy Space Center as had been planned. The flight was originally numbered STS-13.
Mission Specialists George Nelson and James van Hoften repair the captured Solar Maximum Mission satellite on April 11, 1984
Robert Crippen, Terry Hart, James van Hoften, George Nelson, Dick ScobeeSpace Shuttle program← STS-41-B (10)STS-41-D (12) →
The launch of STS-41-C on 6 April 1984
The deployed Long Duration Exposure Facility (LDEF), which became an important source of information on the small-particle space debris environment.
Space Shuttle Challenger (OV-099) was a Space Shuttle orbiter manufactured by Rockwell International and operated by NASA. Named after the commanding ship of a nineteenth-century scientific expedition that traveled the world, Challenger was the second Space Shuttle orbiter to fly into space after Columbia, and launched on its maiden flight in April 1983. It was destroyed in January 1986 soon after launch in a disaster that killed all seven crewmembers aboard.
Challenger in orbit in 1983, during STS-7
Challenger being prepared in 1985 for its penultimate flight, STS-61-A
Challenger atop a Crawler-transporter, en route to the launch site for its final flight, STS-51-L
Challenger being transported by Shuttle Carrier Aircraft 905, shortly before being delivered in 1982