The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
STS-90
Spacelab Module LM2 in Columbia's payload bay, serving as the Neurolab
Spacelab Module LM2 in Columbia's payload bay, serving as the Neurolab
Left to right – Front row: Altman, Searfoss; Back row: Pawelczyk, Linnehan, Hire, Williams, BuckeySpace Shuttle program← STS-89STS-91 →
Left to right – Front row: Altman, Searfoss; Back row: Pawelczyk, Linnehan, Hire, Williams, BuckeySpace Shuttle program← STS-89STS-91 →
Space Shuttle Columbia lands following STS 62 on 18 March 1994.
Space Shuttle Columbia lands following STS 62 on 18 March 1994.
Columbia in the Orbiter Processing Facility after delivery to Kennedy Space Center in 1979. About 8,000 of 30,000 tiles had not yet been installed.
Columbia in the Orbiter Processing Facility after delivery to Kennedy Space Center in 1979. About 8,000 of 30,000 tiles had not yet been installed.
Columbia astronauts Thomas K. Mattingly and pilot Henry Hartsfield salute President Ronald Reagan, standing beside his wife, Nancy, upon landing in 19
Columbia astronauts Thomas K. Mattingly and pilot Henry Hartsfield salute President Ronald Reagan, standing beside his wife, Nancy, upon landing in 1982
The Space Shuttle thermal protection system in the underside of Columbia as seen in a visible (left side) and infrared (right side) image which was ta
The Space Shuttle thermal protection system in the underside of Columbia as seen in a visible (left side) and infrared (right side) image which was taken by the Kuiper Airborne Observatory on STS-3